Poor airflow management can be directly caused by changes to IT equipment undertaken without full consideration. Unfortunately, little thought is given to the fact that any operational decision, such as equipment deployment, has a direct engineering impact on the entire data center.Īir is the main vehicle for cooling IT equipment, and the transient nature of IT equipment deployment affects both airflow and temperature distribution. The Facility Manager (FM) has to react to IT Management (IT) requirements as and when new load capacity plans are decided – usually on short notice. In practice, once a data center is commissioned, IT management take over the operations. The cause can be directly associated with the dynamic nature of the facility IT assets as well as the type of equipment housed are in a constant state of flux. However, owner/operators rarely, if ever, achieve anywhere near full utilization of the available capacity. ![]() Why is the Virtual Facility concept useful in today’s enterprise data centers? Why should data center and IT managers care about it? How can they benefit from it?Ī data center is built with fixed available capacity which includes provision for Space, Power and Cooling. ![]() – Hassan Moezzi, CEO of Future Facilities ( says:
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |